Irrigation and drinking facilities, conversation of water, ground water recharge are the major aims of the project
Side protection work-1100m
Renovation of existing drainage system-2x500m
Kottyamchira- Kannur
Aim of project is to improve irrigation facility, enhance paddy cultivation in wet land
Widening and formation of bund-3900 m
Side protection works with rubble-6700 m
Construction of foot bridge - 1 No (Additional work)
Side protection work with laterate-11080
Construction of VCB - 5no.
Construction of tractor way-6
Silt removal
Constructsion of check dam-3 nos
Construction of Ramp-5no.
Construction of pipe sluice-5 nos.
Renovation of existing drainage system-2x500m
Aim of project is to improve irrigation facility, ground water recharge, water con servation
Deepening of ponds-9
Constrution of 300 mm dia RCC pipe sluice -17 Nos.
Construction of silt collection chamber- 18 nos
Aim of project :To Protect Paddy Fields from flood, To improve Drainage facility, improve irrigation facility
Side protection-4300 m(2 x 2150)
RCC Drainage-1170m
culvert-8 nos.
Deepening of Vachal-450m
Slab covering-135 nos.
Leading channel -332m